Sorry for the delay. I've been burning both ends of the candle the last couple of weeks.
Drywall is done, windows are in, garage doors are on, painting (in the garage) is done, outlets & switches (except for one switch bank) are install, lights are in & TV is hung. The breezeway is primered & ceiling painted, lights are in (except for bathroom) & flooring is in. The hallway flooring will be coming back out because we don't like how it aligns with the existing flooring, so they are coming back and adding a 3/4" subfloor which will align it with the walk in door & the kitchen floor.
We are waiting on brick (still 2 weeks out) and need to get the garage trim work done, which I'll be doing myself. I had planned to have the floor epoxy-coated but funds have just gotten too tight to do it this fall. Next spring will have to be soon enough.
Black ceilings are not for the faint of heart. Rolling just left too many roll marks, so we went back and sprayed it. Ended up using 8 gallons.

My hot/cold spigot turned out nice.

We have heat! It was 30° last week, so this was nice. I have since gotten the t-stat mounted to the wall.

Outlets

My dad talked me into putting an "out of the way" switch in for an outlet that's mounted in the roof soffit. The idea is you could plug in Christmas lights here and have an easy way to turn them on/off. I will probably replace this with a timer switch.

Lights all in.

TV mounted! Too bad my wildcats gave up an early lead in this one. I think I'm going to move the fridge somewhere else, it makes this space feel cramped.

Drywall is done, windows are in, garage doors are on, painting (in the garage) is done, outlets & switches (except for one switch bank) are install, lights are in & TV is hung. The breezeway is primered & ceiling painted, lights are in (except for bathroom) & flooring is in. The hallway flooring will be coming back out because we don't like how it aligns with the existing flooring, so they are coming back and adding a 3/4" subfloor which will align it with the walk in door & the kitchen floor.
We are waiting on brick (still 2 weeks out) and need to get the garage trim work done, which I'll be doing myself. I had planned to have the floor epoxy-coated but funds have just gotten too tight to do it this fall. Next spring will have to be soon enough.
Black ceilings are not for the faint of heart. Rolling just left too many roll marks, so we went back and sprayed it. Ended up using 8 gallons.

My hot/cold spigot turned out nice.

We have heat! It was 30° last week, so this was nice. I have since gotten the t-stat mounted to the wall.

Outlets

My dad talked me into putting an "out of the way" switch in for an outlet that's mounted in the roof soffit. The idea is you could plug in Christmas lights here and have an easy way to turn them on/off. I will probably replace this with a timer switch.

Lights all in.

TV mounted! Too bad my wildcats gave up an early lead in this one. I think I'm going to move the fridge somewhere else, it makes this space feel cramped.