reader2580
Well-known member
I had a paved asphalt driveway installed about 18 months ago. I am having issues with grass/weeds growing right through the edges of the driveway destroying it. I put Roundup on the grass/weeds, but that isn't going to stop new grass/weeds from coming through.
Would it work to cut the driveway back about four inches and then pour a four inch strip of concrete with rebar in it? I suppose weeds/grass could still make their way under the concrete, but probably less likely.
Would it work to cut the driveway back about four inches and then pour a four inch strip of concrete with rebar in it? I suppose weeds/grass could still make their way under the concrete, but probably less likely.

