I am about 70% finished grinding 900 sqft garage floor. The slab is 7 years old and never had any finish on it, area was used for storage. The Edco was doing well and occasionaly took a bit to longer to cut the darker top layer. once past the top 1/32, grinding is easy again. The last part is killing me! A new cutter will work well for about 7 minutes then it barely cuts and almost floats on top. I tried a 7" diamond cup on my grinder and that works slightly better but you still got to work at it. I spent atleast 16 hours so far and both the Edco and I slowed drasticaly at the end of today. I wanted to do a acid stain and clear, so i need to cut through the top layer or the last 30% will look nothing like the first part.
Any suggestions?
Thanks
Any suggestions?
Thanks