BentBierz
Well-known member
Hello,
I am getting new metered power run to a detached building and will have several sub panels inside the building coming off of the main panel. One panel is for general lighting, outlets, bench top equipment, etc. I will also have a panel coming off of a Phase Perfect digital phase converter to supply 3 phase power for up to 5 pieces of equipment.
Question: Regardless of use, is it required to have each sub panel in a building attached to a grounding rod or is the requirement only for the main panel? Thanks.
I am getting new metered power run to a detached building and will have several sub panels inside the building coming off of the main panel. One panel is for general lighting, outlets, bench top equipment, etc. I will also have a panel coming off of a Phase Perfect digital phase converter to supply 3 phase power for up to 5 pieces of equipment.
Question: Regardless of use, is it required to have each sub panel in a building attached to a grounding rod or is the requirement only for the main panel? Thanks.