What do the pro’s do when you start to drive ground rod and hit rock at 2 foot. Here in Kansas we have a lot of lime stone. My layer of lime stone is about 5 feet thick. What would you do??
If you have rebar in your slab, you can find a spot to punch in and tie on to the rebar for a UFER ground. It's rough but doable.
it always irks me that inspectors are constantly missing the fact that ufer ground is not optional. If you have a footer with rebar in it, you HAVE to bond the rebar...(on new construction, and inspector has to sign off on it before the pour
To late for ufer ground, slab is in already. although my jib crane could be used as a ufer ground i guess. The footing for the jib sets on the rock layer which I drilled and drove lots of rebar into the rock and the anchor bolts for the jib are welded to the rebar. Only problem here is the jib would be about 20' from the panel. would that work?? I can try to drive at a 45 degree, but I know for a fact the rod will hit rock at about 2 foot will that be deep enough if i can get the rod driven at a 45. Question if you have a ground rod or two why and what is a ufer (i know its rebar from your footing but why)
not sure about that, just call the electrical inspector.....let him know what is going on....i didn't know it was a metal building...according the 2011 NEC you will have to have a ufer ground (that is of course if your AHJ has adopted the new code.
call him/her and let them know what the situation is....they will work with home owners much better than an electrical contractor.

another note: should I some how ground my sheet metal on my pole building. If so how?
I believe you have to ground it. I'm not an electrician, but I work in an industry where we have had people get killed because metal buildings and/or siding was not grounded. If it's not grounded and it made hot somehow, you become the ground when you touch the metal. Even if it's not required, please ground it.