I had a red iron building built back earlier this year. Looked at getting some of the electrical done and was wondering about grounds. The building has a 4 wire feeder ran to an inside panel at the shop. It is fed from the house that has two ground rods to my service up there. I know there needs to be two ground rods placed at the shop, but what about the building itself? Should it be ran to same ground rods or have a bare ground ran from it to a separate set of grounds rods? Or will it be tied back to the panel? Little lost here and just want to make sure it's done right. Thanks for your help.