gussteve
Well-known member
Well here we go, finally figured out that i had to upload pics to imigur to shrinkem to get em on here.So heres how it looked after breaking out the chain saw,and partner saw to the measly building that was here when i bought the place.
paid concrete guys to grade and gravel then called of couple of my buddies over for pizza and beers,and radiant of coarse
thats me laying it out ,got four zones within a couple feet of difference in length,and equal outside wall coverage after a few pieces of graph paper.
i recommend every build have a guy holding a beer and the mascot trusty dog to watch and make sure everythings goin smooth ,lost that dog miss her.
go guys go
it has a nice 1/4 pitch per 10' for the melted snow to roll right out the door and works great,only reason i had pro s do it .The pad is 30'x 30''I'll do my driveway but the foundation was to important for me to take on.
thats me laying it out ,got four zones within a couple feet of difference in length,and equal outside wall coverage after a few pieces of graph paper.
i recommend every build have a guy holding a beer and the mascot trusty dog to watch and make sure everythings goin smooth ,lost that dog miss her.
it has a nice 1/4 pitch per 10' for the melted snow to roll right out the door and works great,only reason i had pro s do it .The pad is 30'x 30''I'll do my driveway but the foundation was to important for me to take on.