I rerouted 2 gutter downspouts for a future concrete pour and had a few questions if anyone has any experience with this.
After trenching we sloped everything 1/8in to the pop up emitter however due to a sprinkler line we had to raise the start of the run a little higher which in turn put the start of the run right at ground level.
Any concerns regarding the slope messing up after backfilling?
Any concerns with the trenched area being a little higher when the concrete crew starts to prep & form the patio? In the third picture I have about 6.5” & 8” drop for the concrete to be poured and leveled with existing patio.
Any insight would be appreciated. If I need to redo it again I still have time if any adjustments need to be made.
After trenching we sloped everything 1/8in to the pop up emitter however due to a sprinkler line we had to raise the start of the run a little higher which in turn put the start of the run right at ground level.
Any concerns regarding the slope messing up after backfilling?
Any concerns with the trenched area being a little higher when the concrete crew starts to prep & form the patio? In the third picture I have about 6.5” & 8” drop for the concrete to be poured and leveled with existing patio.
Any insight would be appreciated. If I need to redo it again I still have time if any adjustments need to be made.