1) 4 square metal box with 90 degree cord grips installed using integral strain reliefs.
1a) Same as above except use straight cord grips and use seperately mounted strain reliefs($$) screwed to the truss, cieling, etc.
1b) Same as above except tie a knot in the cord around the truss instead of using a strain relief(cheapest option).
12-3 SO cord is what I'd use for the drops. Depending on how many receps you need you could use a simple cordend, a handy box for a duplex, or a 4 sq box for a quadplex. The metal boxes would need a cordgrip/strain relief on them.
The options I gave you weren't checked against the code book so take it for what it's worth. It's just what I'd do, as an electrician, in my own shop.
