Any have tips on best practice for hanging steel on the gables? I've got 4' of one color along the bottom and then tall pieces of another color above that. The color change will break at the bottom of the lower 4'x'6' window. Soffit is already installed with integrated J channel. I need to fit the 20' tall pieces between the upper J channel and the lower Z flashing.
Thinking I would start with a seam in the middle of the wall and work out to the ends?. Seems like that would be the most efficient since I can get the first piece cut right, then cut 3 more pieces just like it (well 2 would be mirrored but have same length and angle).
I am planning on renting a boom lift to have one guy up high and one guy down low to get it in position and screw it off.
Am I on the right track here? Older picture, but gives you an idea of the building I am working with.
Thinking I would start with a seam in the middle of the wall and work out to the ends?. Seems like that would be the most efficient since I can get the first piece cut right, then cut 3 more pieces just like it (well 2 would be mirrored but have same length and angle).
I am planning on renting a boom lift to have one guy up high and one guy down low to get it in position and screw it off.
Am I on the right track here? Older picture, but gives you an idea of the building I am working with.