Finally getting close to completion on the garage remodel/build. Last minute decision was to place 3x5 hardie board - the waterproof one - as the first course on the wall at the floor, and then transition to drywall above that. We've flooded twice in 20 years of living here but that was enough..and I'd like to avoid soaked drywall if it ever happens again - so I have a few questions.
Am I correct in using normal tile thinset for the joints between the boards and also at the top where it will transition to drywall?
I'm thinking about putting tile on that first 3' - anyone done this? Where should the top tile land - at the very top edge of the hardie board? Any other ideas instead of tile?
One guy suggested to just stucco it and have a sanded finish at the bottom and transition to the drywall at the top w/knock down. I guess if the transition isn't perfect, I can put a piece of trim.
Am I correct in using normal tile thinset for the joints between the boards and also at the top where it will transition to drywall?
I'm thinking about putting tile on that first 3' - anyone done this? Where should the top tile land - at the very top edge of the hardie board? Any other ideas instead of tile?
One guy suggested to just stucco it and have a sanded finish at the bottom and transition to the drywall at the top w/knock down. I guess if the transition isn't perfect, I can put a piece of trim.