The foundation guys completed their prep work and we were waiting for concrete. Got over two inches of rain and now my beam troughs are collapsing. Is this a total loss or can this be salvaged? The troughs/beams are (were) 12" wide and 24" deep.

I live about 60 miles South of Houston and the ground is usually hard gumbo. Right now it is soft clay.
 

Attachments

  • IMG_4559.jpg
    IMG_4559.jpg
    112.7 KB · Views: 268
  • IMG_4560.jpg
    IMG_4560.jpg
    100.4 KB · Views: 246
  • IMG_4561.jpg
    IMG_4561.jpg
    137.3 KB · Views: 262
  • IMG_4564.jpg
    IMG_4564.jpg
    143 KB · Views: 252
To avoid these ads, REGISTER NOW!

wssix99

Well-known member
Joined
Mar 2, 2011
Messages
5,161
Location
Chicago, IL
This is standard operating conditions for any foundation. It's not a total loss - it just needs to be cleaned up. Your contractor should have pumps and experience doing this.

Up here, where we need to dig deep foundations, you can even take a canoe ride in the troughs after a good rain!

Ultimately, you loose more material from the sides of the trenches, which means that more concrete or more fill will be needed for the job. That will drive up cost, but hopefully that won't be your problem!
 

8man

Well-known member
Joined
Oct 16, 2013
Messages
630
Location
Bryan, Texas
They need to clean out the beams. When building homes in Houston, we had this happen and that is what we did.
 

saceone

Well-known member
Joined
Dec 31, 2011
Messages
388
Location
Montreal Canada
step 1- relax
step 2- install pump, pump water
step 3- drink cold beer
step 4 - repeat step 3 as long as step 2 isn't completed
step 5- repeat step 3 one last time while inspecting the job
 
To avoid these ads, REGISTER NOW!

ms fowler

Well-known member
Joined
Jun 27, 2012
Messages
450
Location
Littlestown, PA _ 6 miles south of Gettysburg
One more thing. If possible, keep people from walking on the wet footing sub soil. If it is wet, and you remove the water, most likely everything will be fine. However, if people track up the wet soil and muck it up, someone needs to remove the disturbed mud beofre placing concrete. You could place the concrete right through the water, IF the soil was not disturbed. Concrete loves water, and cures best when submerged.
 
OP
O

oldiemotors

Active member
Joined
Aug 14, 2015
Messages
28
Thanks again. The crew is supposed to be back onsite tomorrow. I'll see what they plan to do and how they plan to do it.
 