I thought we had a bad economy and everyone is looking for work. I've made over a dozen calls asking for quotes and only 2 called back. Another told me I was being unrealistic to only ask for bids for specific parts of the build. 
It is going to be a 30x48 stick built garage. I asked for bids for a septic installer. It will have a half bath. I need to get bids and drawing submitted to the health department to get a septic permit. Once the septic permit is issued I can get the building permit. I've called no less than 3 licenced installers, one of them 3 times. None called back.
I was going to have a professional do the foundation. I was going to frame it out. Then I wanted to have someone come in and set the trusses. I was willing to do the rest. Is that being unrealistic? The general said I wanted to do all the easy work and leave the rest for a contractor. It looks like I may just get the foundation and septic done then do everything else. I am just floored by the lack of response from contractors.

It is going to be a 30x48 stick built garage. I asked for bids for a septic installer. It will have a half bath. I need to get bids and drawing submitted to the health department to get a septic permit. Once the septic permit is issued I can get the building permit. I've called no less than 3 licenced installers, one of them 3 times. None called back.
I was going to have a professional do the foundation. I was going to frame it out. Then I wanted to have someone come in and set the trusses. I was willing to do the rest. Is that being unrealistic? The general said I wanted to do all the easy work and leave the rest for a contractor. It looks like I may just get the foundation and septic done then do everything else. I am just floored by the lack of response from contractors.