jtad
Member
I'm sure this has been covered on here before but I'm new here. I am building a new shop. Slab was poured Mon, 50x50 with some porches total of about 3100 sq ft. How long do I need to wait before I can put this product down on a new slab? So at 400 sq ft per gallon is per coat? So 8 gals would only get me one coat, so I would need 16-24 gals to get the 2 -3 coats? Are there any videos that show the process, I've only found one and its the one on Legacy's web site.
Last edited:
