I'm framing in a 12x24 room inside a 24x48 steel building. We are planning on pouring a floor for it shortly. It'll have drill press, lathe etc in it and a storage area above. Head room wont be more than 8'.The original plan was to have floor heat through the whole thing. For now it'll be only concrete in the 12x24 area. Do you think floor heat is still the best plan or go with another option? Have gas available at road or propane from an outside tank. The shop will be used and average if 16 hours a week or so. Thanks and any tips are appreciated.