kert
Well-known member
One day for sure to go from a VB on top of the prepared subgrade to all foamed and pexed ready for pour. Really much less than a day.
That may be a little optimistic depending on if and how many helpers you have. I did my 30x60 in a long day and a half. I had help the first day and was by myself the second.
I also took a bunch of pictures back and forth across with a couple tape measures so I know where the tubes are if I ever need to drill holes (already have).
I also would be happy to never see another ziptie again in my life.