Hi, I'd like advice on correcting shed placement and level after poor installation of wood 8x12 shed on 6x6 skids.
I made a framed 3" compacted crushed stone base. In my area most sheds are on blocks. Shed was delivered by friend of guy who built the shed, and he didn't like the gravel. He rolled it off the trailer 1-2 feet forward of the base and proceeded to raise it with blocks and lumber. It's now 18" off ground. Is it possible to raise the shed, extend gravel base, add pavers and level, and then lower shed?
I appreciate your advice!
I made a framed 3" compacted crushed stone base. In my area most sheds are on blocks. Shed was delivered by friend of guy who built the shed, and he didn't like the gravel. He rolled it off the trailer 1-2 feet forward of the base and proceeded to raise it with blocks and lumber. It's now 18" off ground. Is it possible to raise the shed, extend gravel base, add pavers and level, and then lower shed?