Jeepbeater
Member
- Joined
- Feb 12, 2008
- Messages
- 11
I have a Adam's Truss building, (similar to a Miracle Truss). Normally these buildings would have a steel building insulating blanket put down over the purlins and then the steel roof would be screwed down on top.
My Roof is plywood, felt paper and shingled like the house. I have vented soffits all the way around and a ridge vent that runs the length of the building. I realize now that I should have put some 2x4s perpendicular to and on top of the purlins and then put the plywood down to vent the roof, but I am a little late for that now. Roof is finished and I'm not tearing it off.
Based on these pictures how would one go about insulating this roof and do I need to be concerned with airflow beneath the plywood?
Was thinking about drilling some 2" holes in the 2x6 Purlins to provided airflow? Necessary?
What about framing down using a 2x4 nailer attached to the underside of the purlins run perpendicular with a 2x6 tied on the side. That way I have the airflow and can then fill the framed down section with batts and cover the underside with drywall or some lighweight paneling.
Just fill it in with batts as it sits now and forget about it?
Ideas, suggestions?
I'm located in Maryland near the Bay.
Thanks,
John
My Roof is plywood, felt paper and shingled like the house. I have vented soffits all the way around and a ridge vent that runs the length of the building. I realize now that I should have put some 2x4s perpendicular to and on top of the purlins and then put the plywood down to vent the roof, but I am a little late for that now. Roof is finished and I'm not tearing it off.
Based on these pictures how would one go about insulating this roof and do I need to be concerned with airflow beneath the plywood?
Was thinking about drilling some 2" holes in the 2x6 Purlins to provided airflow? Necessary?
What about framing down using a 2x4 nailer attached to the underside of the purlins run perpendicular with a 2x6 tied on the side. That way I have the airflow and can then fill the framed down section with batts and cover the underside with drywall or some lighweight paneling.
Just fill it in with batts as it sits now and forget about it?
Ideas, suggestions?
I'm located in Maryland near the Bay.
Thanks,
John
Attachments
Last edited: