Hi everyone,
I am putting down epoxy in my garage. I went with Wolverine coatings. I bought the supplies in June and had them stored in a spare bedroom at my house at a temp about 70 degrees. I finally got around to putting the floor down. Yesterday I put down the bondtite primer, and today it looks great. I am about to start the liquatile, but when I opened the 3 gallon container of part A there is about an inch of thick sludge at the bottom. So I opened one of the 1 gallon containers of Part A and same thing, the one gallon container is also only half full. Can someone tell me if this is normal? Or do I have a bad batch? Im literally about to mix part A and B, so if someone could let help me out ASAP I would appreciate it.
I am putting down epoxy in my garage. I went with Wolverine coatings. I bought the supplies in June and had them stored in a spare bedroom at my house at a temp about 70 degrees. I finally got around to putting the floor down. Yesterday I put down the bondtite primer, and today it looks great. I am about to start the liquatile, but when I opened the 3 gallon container of part A there is about an inch of thick sludge at the bottom. So I opened one of the 1 gallon containers of Part A and same thing, the one gallon container is also only half full. Can someone tell me if this is normal? Or do I have a bad batch? Im literally about to mix part A and B, so if someone could let help me out ASAP I would appreciate it.
