Ok so i'll be converting my 3 car garage into a 2car garage w/ workshop... Here are pics of my garage in its current state - No, it's not usually this clean; everything was moved outside to prep for my epoxy 
So my question is this... I plan on installing a stationary workbench along the west wall (door side). It will be an 8' x 24" x 39". I plan on lag bolting a 2x4 the back of the workbench across my existing studs. I then will use 4 2x's underneath as support sitting on the foundation wall (I have approximately 4 1/4" gap)
I'm a little worried because the concrete is sloped across the 8ft spread (drops 1 1/2"). Because of this, I'm looking for suggestions on the front posts - should I do 4x4's or 2x4's ? I don't plan on ever overloading the bench but I'd rather be safe then sorry.
Any input would be appreciated
So my question is this... I plan on installing a stationary workbench along the west wall (door side). It will be an 8' x 24" x 39". I plan on lag bolting a 2x4 the back of the workbench across my existing studs. I then will use 4 2x's underneath as support sitting on the foundation wall (I have approximately 4 1/4" gap)
I'm a little worried because the concrete is sloped across the 8ft spread (drops 1 1/2"). Because of this, I'm looking for suggestions on the front posts - should I do 4x4's or 2x4's ? I don't plan on ever overloading the bench but I'd rather be safe then sorry.
Any input would be appreciated
Last edited:
