g1teg
Member
"Engineered granular fill as required, to extend out beyond edge of foundation a distance equal to the thickness of the engineered fill beneath the foundation"
Because my site is on a slope, I dug it out, am building a retaining wall, and filling up to grade with gravel compacted in 4" lifts. I will have roughly 50" of gravel under the pad.
On the sides of the slab with the retaining wall, I have extended my gravel 5' to the sides. On the side of undisturbed ground at grade, I extended beyond my slab by 1'. I've just noticed this note.
Why would I need to go out so far in all directions????
Because my site is on a slope, I dug it out, am building a retaining wall, and filling up to grade with gravel compacted in 4" lifts. I will have roughly 50" of gravel under the pad.
On the sides of the slab with the retaining wall, I have extended my gravel 5' to the sides. On the side of undisturbed ground at grade, I extended beyond my slab by 1'. I've just noticed this note.
Why would I need to go out so far in all directions????