Not sure if this is the right place for this question or not, but pouring a final ~10x40 slab in my shed (long over due)...this is going in a metal quanset style metal building.
My concern is, there is already a footer/foundation there, but too high that I can't use it as a strike off. so, not sure how to word, this other than I need to maintain a slope from existing slab to the existing foundation...so need the concrete line to land about 3/4 inches below top of that existing foundation.
Was wondering if anyone has encountered where it's not clear/easy to strike off the concrete. Do you just eyeball it?
My concern is, there is already a footer/foundation there, but too high that I can't use it as a strike off. so, not sure how to word, this other than I need to maintain a slope from existing slab to the existing foundation...so need the concrete line to land about 3/4 inches below top of that existing foundation.
Was wondering if anyone has encountered where it's not clear/easy to strike off the concrete. Do you just eyeball it?
Last edited: