wesalexleft
Well-known member
Okay, I know this is a vague question and I'm likely to get any number of answers, but just looking for advice. I've pulled the trigger and have 500 sq.ft. of 18", PEI IV, porcelain tile stacked and ready to put down. The concrete it's going over is a 40 y/o pad and the concrete is the texture of sidewalk (rough). It's reasonably clean with a few oil spots that I plan on spot cleaning with mineral spirits, etc, but they're not beading water now. I pressure washed the concrete in the fall, and will do so again before tiling. Is there anything else I'd need to do? I don't want a weekend tiling project to become a week long concrete scrubbing,but of course I don't want to have tiles popping loose either. I will be using the Kerabond/Keralastic. Also, after washing, how long before tiling? I see some advice saying to wait days, while other sites say to pre-wet concrete to avoid flash drying of the thin set.
thanks,
thanks,
