The top purlin of my side sheds is also a wall girt. The top edge is beveled to match the side shed pitch. You may want to consider that idea. The shed roofing projects through the upper wall, another wall girt is needed just above the shed roof to attach the flashing to, then sheet the upper wall. Below the side shed roof, J channel is nailed to the beveled girt to wrap the top of the lower side wall steel. Hope that helps.