ericm
Well-known member
The place we just bought has a large irrigation pump that's run off a dedicated 480 3phase. There's an electric gate which I'm pretty sure is run off the same meter. The docs for the gate operator say that it can run on 120 or 240v single phase.
My question is how do they normally get single 120/240 single phase from 480 three phase and does it matter for the three phase equipment?
My question is how do they normally get single 120/240 single phase from 480 three phase and does it matter for the three phase equipment?