Getting ready for the pour of my slab-on-grade floor (5" slab with thicker perimeter) and got to thinking about the 2" XPS foam (OC Formular 25) that will be installed (by me) ahead of the pour.
How the heck do you keep this in place on top of the gravel/traffic-bond?
I expect some movement when the concrete hits the foam, but I'd like to minimize this. (I plan to put 10-mil poly on top of the foam as a vapor barrier.)
TIA
How the heck do you keep this in place on top of the gravel/traffic-bond?
I expect some movement when the concrete hits the foam, but I'd like to minimize this. (I plan to put 10-mil poly on top of the foam as a vapor barrier.)