CarCrazyRDM
Well-known member
I've done plenty of basic electrical work in the past but this is my first full wiring of a structure as well as my first full panel. So take a look at the pics below and let me know if you see anything of concern or that you think an inspector might call me out on. I hope to get someone out this week to check both my electrical rough in work and the drain line work for my plumping.
One quick inspection question... do inspectors require/expect all ground wires to be joined together in junction boxes at the time of rough in inspection? Or does it matter since I expect that is something they will check at final anyway?
One other quick note/question... the large "roll" of curled up power and neutral wire in the top left corner of the box is for a circuit of which I am not powering at this point (for possible future use upstairs). Is having it rolled up and the end of the wires capped inside the panel acceptable for something like this?
And everything is labeled now on the panel cover (not sure if that is required or not) and it has obviously been removed for inspection.
One quick inspection question... do inspectors require/expect all ground wires to be joined together in junction boxes at the time of rough in inspection? Or does it matter since I expect that is something they will check at final anyway?
One other quick note/question... the large "roll" of curled up power and neutral wire in the top left corner of the box is for a circuit of which I am not powering at this point (for possible future use upstairs). Is having it rolled up and the end of the wires capped inside the panel acceptable for something like this?
And everything is labeled now on the panel cover (not sure if that is required or not) and it has obviously been removed for inspection.
Last edited:
