I am in the process of picking up a MaxJax 2-post 6k lift, and should have it this weekend. Odd thing is, I'll actually have the lift before I pour the slab I'm going to use the lift on. Pad will be 4-5" thick, dimensions 24x32. Here's my question. How long will the concrete need to cure before I can set the anchors for the MaxJax?
