I just had my the floor poured in the new garage. As soon as it gets warms I want to epoxy it. I know it'll save me a lot of prep time if I get it epoxied before I get it oily and dirty.
So do I have to wait a certain amount of time before gettting it epoxied or can I do it immediately?
So do I have to wait a certain amount of time before gettting it epoxied or can I do it immediately?
