This is my first post although I have been reading this forum for quite a while and appreciate the help and advice that is given.
My garage floor is being poured tomorrow Wednesday (again thanks to this forum for advising against pouring over old slab) and I was wondering how long before I can start moving my woodworking shop back in. We won't be parking a car on it but the machines I have are fairly heavy (Table saw, band saw, 8" jointer, 15" planer, and drill press) I can get a crew for the next Sunday but that is only 4 days...It would be 2 weeks before I can get enough help to move them back. I'm not sure the weather will hold up that long and I'm not fond of moving everything back during a rain or snow storm.
Any advice would be appreciated.
This is my first post although I have been reading this forum for quite a while and appreciate the help and advice that is given.
My garage floor is being poured tomorrow Wednesday (again thanks to this forum for advising against pouring over old slab) and I was wondering how long before I can start moving my woodworking shop back in. We won't be parking a car on it but the machines I have are fairly heavy (Table saw, band saw, 8" jointer, 15" planer, and drill press) I can get a crew for the next Sunday but that is only 4 days...It would be 2 weeks before I can get enough help to move them back. I'm not sure the weather will hold up that long and I'm not fond of moving everything back during a rain or snow storm.
Any advice would be appreciated.