Innovate1
Well-known member
I think the standard is 28 days but wanting to get things done... If I should wait I will.
Have a 5" slab and thinking about getting drywall and other materials inside. So it will be a fork lift with a stack of drywall and similar. The rest of the stuff could stay outside but the drywall needs to go inside.
Have a 5" slab and thinking about getting drywall and other materials inside. So it will be a fork lift with a stack of drywall and similar. The rest of the stuff could stay outside but the drywall needs to go inside.