I bought one full epoxy-coat kit from Lowes to do my 2 car garage. They say have you have 15 mins before it would harden off the epoxy. When you did your 2 car garage, how many batches did you make? trying to get an estimate so I don't run out of time. This is my first time applying epoxy coating and want to do it right.
Instructions say you need to mix part A for 3 mins and then A and B for 2 mins which is total of say 6 mins. If you divide 1 full kit into 5 to 6 batches to make sure you have enough time, will you see lines or it all blends in nicely?
Instructions say you need to mix part A for 3 mins and then A and B for 2 mins which is total of say 6 mins. If you divide 1 full kit into 5 to 6 batches to make sure you have enough time, will you see lines or it all blends in nicely?
