Dick in Wisconsin
Well-known member
From the main panel in the basement and a 20 y/o drawing from the power company, I think we have a 220v, 200amp service to the house. I am going to build a 1,000sf race shop which will need electricity. I'd been planning on running a 100amp subpanel in the shop off the main panel in the basement.
Now I'm reading that there might possibly be a way that I can run a second 200amp main panel after the meter (but before the existing main panel?) directly to the shop (the meter is on the back side of the house, near where the shop will be).
This would allow me to:
1. NOT have try to get the cable from the existing main panel in the basement through the wall and to the shop.
2. allow me to run the appropriate wire from the meter to the shop.
3. allow me to have a 200amp panel in the shop.
All of this is contingent on there being enough or the right "lugs" in the "thing" that the meter is fastened to on the outside of the house.
Is this correct? Thanks
Now I'm reading that there might possibly be a way that I can run a second 200amp main panel after the meter (but before the existing main panel?) directly to the shop (the meter is on the back side of the house, near where the shop will be).
This would allow me to:
1. NOT have try to get the cable from the existing main panel in the basement through the wall and to the shop.
2. allow me to run the appropriate wire from the meter to the shop.
3. allow me to have a 200amp panel in the shop.
All of this is contingent on there being enough or the right "lugs" in the "thing" that the meter is fastened to on the outside of the house.
Is this correct? Thanks