Finally got plans stamped and am getting quotes for my pad.
Pad is a 30x40 floating in Atlantic Canada. Supporting a garage that won't be heated it's first winter, but will get a heatpump/insulation next year.
Plans call for full underslab insulation, vertical insulation, and wings extending 6'. However they specify you don't NEED insulation, it's just then on you if it heaves or cracks.
The quotes I'm getting are definitely putting me over budget, so I'm trying to cut where I can.
I'm strongly thinking of cutting the under slab insulation as that saves me nearly $2500, and I dont have radiant heat, and am not trying to keep the garage warm in the winter, more like 15C max.
For the wings Im obviously keeping vertical, but I don't know how much to cut down the horizontal wings? I was originally planning on 24", but don't want to risk any heave, especially in the first winter.
Im thinking just vertical and 24" wings should be sufficient, especially since the contractor quoted me for 6" of crushed rock (0-3/4, as per the plans), ontop of 1' of pit run. So realistically an 18" base.
Looking for any input. Id like to cut some costs and savings here, but don't want to underdo it and risk heave.
Thank!
Finally got plans stamped and am getting quotes for my pad.
Pad is a 30x40 floating in Atlantic Canada. Supporting a garage that won't be heated it's first winter, but will get a heatpump/insulation next year.
Plans call for full underslab insulation, vertical insulation, and wings extending 6'. However they specify you don't NEED insulation, it's just then on you if it heaves or cracks.
The quotes I'm getting are definitely putting me over budget, so I'm trying to cut where I can.
I'm strongly thinking of cutting the under slab insulation as that saves me nearly $2500, and I dont have radiant heat, and am not trying to keep the garage warm in the winter, more like 15C max.
For the wings Im obviously keeping vertical, but I don't know how much to cut down the horizontal wings? I was originally planning on 24", but don't want to risk any heave, especially in the first winter.
Im thinking just vertical and 24" wings should be sufficient, especially since the contractor quoted me for 6" of crushed rock (0-3/4, as per the plans), ontop of 1' of pit run. So realistically an 18" base.
Looking for any input. Id like to cut some costs and savings here, but don't want to underdo it and risk heave.
Thank!