So here is the deal, SWIM is a licensed C-10 contractor with an elderly neighbor who has a ~60 year old 100 amp Zinsco meter main WITH a smart meter. In my area the water bond must be at the point where the water enters the dwelling which in her situation means opening up ~75' of T&G vaulted ceiling because there is zero attic or crawl space anywhere to get where the city water enters on the opposite side of the house.
She is on SS with no family and SWIM has been keeping her Zinsco panel going for her by moving and replacing breakers for years now but last week was the last straw. The Main 100a breaker burned up 1 phase of it's self and the bus bar. SWIM has her temporarily fed with a 60amp breaker but that's as big as he had saved from previous Zinsco replacements since the new replacements are $$$
Her panel should have been replaced years ago but she flat out does not have the money even if SWIM did the electrical labor free. If SWIM were to pull her smart meter for 6 hours or so would the power company know and send someone out. What about jury rigging it so has power on the line side? It would still be disconnected for some time. SWIM has meter lock tags from SCE.
SWIM wants to help the woman but is afraid this might turn into a no good deed goes unpunished situation despite the fact that it will be a safer system. SWIM will just use the existing water bond at it's current location, then add a ground rod and bond the cold/hot/gas.
Exterior pipe work or interior wire mold are looking like SWIM's only options but that's just more cost and time not to mention the aesthetics.
Thoughts?
She is on SS with no family and SWIM has been keeping her Zinsco panel going for her by moving and replacing breakers for years now but last week was the last straw. The Main 100a breaker burned up 1 phase of it's self and the bus bar. SWIM has her temporarily fed with a 60amp breaker but that's as big as he had saved from previous Zinsco replacements since the new replacements are $$$
Her panel should have been replaced years ago but she flat out does not have the money even if SWIM did the electrical labor free. If SWIM were to pull her smart meter for 6 hours or so would the power company know and send someone out. What about jury rigging it so has power on the line side? It would still be disconnected for some time. SWIM has meter lock tags from SCE.
SWIM wants to help the woman but is afraid this might turn into a no good deed goes unpunished situation despite the fact that it will be a safer system. SWIM will just use the existing water bond at it's current location, then add a ground rod and bond the cold/hot/gas.
Exterior pipe work or interior wire mold are looking like SWIM's only options but that's just more cost and time not to mention the aesthetics.
Thoughts?