Arkive
Well-known member
The subject mostly sums it up. I'm doing an epoxy garage floor project and am carrying the epoxy up the 2' stem wall in the process. I've applied a thin layer of mortar to my garage stem wall to fill in the trowel marks and create a rounded cove at the base. That said, how long do I have to wait before applying my epoxy to ensure there's no trapped moisture? It's about a 1/2" at most at its thickest. Thanks!
