nate379
Banned
Guys, I had to relocate the gas line running to my boiler since it was in the way of my soon to be placed water softner. I'm not sure what the correct way to clamp the pipe to the wall would be.
The pipe I have is 1" black pipe.
What I have used in the past are "C" type straps and then cut a spacer out of wood to put behind it. In this case, I have about 3/4" space between the wall and the pipe.
Am I using the correct thing?
The pipe I have is 1" black pipe.
What I have used in the past are "C" type straps and then cut a spacer out of wood to put behind it. In this case, I have about 3/4" space between the wall and the pipe.
Am I using the correct thing?
) has all the installation data including the structural qualities, finish details, etc. Makes a good reference manual for anyone doing equipment installs.