timgr
Well-known member
There have been a couple of posts lately about slow drying or sticky floors. Responses suggest that this may result from inaccurate mixing ratios.
Any suggestions out there about how to divide epoxy products to make smaller batches? Some (most? all?) manufacturers suggest mixing everything at once, but for a small job, this doesn't seem desirable for small, one man (or one man and a helper) jobs like a garage floor.
Any suggestions out there about how to divide epoxy products to make smaller batches? Some (most? all?) manufacturers suggest mixing everything at once, but for a small job, this doesn't seem desirable for small, one man (or one man and a helper) jobs like a garage floor.
