Hey all,
Im in the process of setting up the rough-in electrical and plumbing lines for my lofted garage. Just finished the block wall, haven't started the slab yet. Trying to figure out the best way of doing this...
Aside from the obvious drilling a hole through the block and putting a 1/2" larger sleeve in, does anyone have any recommendations for the best way to feed supply lines through a cinder block foundation wall then going UP through a slab?
Are you supposed to just put a 90deg and have it pass through the slab in a corner of the garage after it goes through the stem wall??
I attached a pic, need to feed in in through about that blue highlighted block, then up to the second story some how.
Any recommendations?
**UPDATE**
Found this nifty link showing two good routings"
http://www.renovation-headquarters.com/power-outbuilding.html#.WdlikUyZNch
Im in the process of setting up the rough-in electrical and plumbing lines for my lofted garage. Just finished the block wall, haven't started the slab yet. Trying to figure out the best way of doing this...
Aside from the obvious drilling a hole through the block and putting a 1/2" larger sleeve in, does anyone have any recommendations for the best way to feed supply lines through a cinder block foundation wall then going UP through a slab?
Are you supposed to just put a 90deg and have it pass through the slab in a corner of the garage after it goes through the stem wall??
I attached a pic, need to feed in in through about that blue highlighted block, then up to the second story some how.
Any recommendations?
**UPDATE**
Found this nifty link showing two good routings"
http://www.renovation-headquarters.com/power-outbuilding.html#.WdlikUyZNch