Hello all! I have a question that I don't see has been answered (to the extend of my issue). I had a concrete guy come out to add an extension off our front patio. The guy has good prices and plenty of references but he works by himself. The guy prepped the area and laid out the forms and all looked ok. The problem I have now is that the guy put in a drainage slope that is way too much. The patio is 16 feet wide and the guy put a slope of 1/4 inch a foot, so the far side is down about 4 inches from the front side. This is way too much a slope & more than I wanted.
On the day of the concrete pour, it looked to me like he had dropped the forms on the far side a bit. So I went to speak with the concrete guy about the issue. However, he was obviously in distress. It was very hot outside so the concrete was drying faster than normal, so this old guy was busting his hump to get the job done. One look at the guy told me that I better get ready to call 911 (seriously). In any event, the concrete slope issue was pushed by the wayside, and my neighbor and I did our best to get the guy cooled off.
He kept trying to get up and finishing the job until I finally told him no job is worth his life. Anyway, the guy waited a little bit until he felt better and then left. However, now I can't get ahold of him and have no idea of how to level up the concrete. Perhaps he dropped the far side form because he didn't order enough concrete. I don't know so I've want to see if there is a way to fix this problem without pulling up the slab. Anyone have any ideas? Thanks in advance to all who offer suggestons and advice!
On the day of the concrete pour, it looked to me like he had dropped the forms on the far side a bit. So I went to speak with the concrete guy about the issue. However, he was obviously in distress. It was very hot outside so the concrete was drying faster than normal, so this old guy was busting his hump to get the job done. One look at the guy told me that I better get ready to call 911 (seriously). In any event, the concrete slope issue was pushed by the wayside, and my neighbor and I did our best to get the guy cooled off.
He kept trying to get up and finishing the job until I finally told him no job is worth his life. Anyway, the guy waited a little bit until he felt better and then left. However, now I can't get ahold of him and have no idea of how to level up the concrete. Perhaps he dropped the far side form because he didn't order enough concrete. I don't know so I've want to see if there is a way to fix this problem without pulling up the slab. Anyone have any ideas? Thanks in advance to all who offer suggestons and advice!