I need to level a metal grid, 16' x 7', the grid sections are roughly 2'x2' and built of 1.5''x1.5'' 100 wall steel box tube.(full perimeter frame with divisions for grid, all fully welded into a solid unit)
Concrete floor has a slight slope and grid needs to be level, grid will need to support approx 25000 lbs. This is approx 112 sq' at 205 lbs per sq foot, not sure how to calculate weight applied to actual grid?
? will self leveling cement hold up to this small of a contact area, suggestions appreciated! Thanks