To avoid these ads, REGISTER NOW!

How to remove this type of flooring

camaross

Well-known member
Joined
Oct 15, 2009
Messages
1,735
Location
Maryland
Below is a picture of my kitchen floor. They were installed by the builder about 10 years ago. I plan to remove the current flooring and lay ceramic tiles.

It seems that they are glued to the plywood. Anyone knows how to remove them?

P8280350.jpg


Thanks.
 
Last edited:
To avoid these ads, REGISTER NOW!

jhelrey

Well-known member
Joined
Sep 15, 2010
Messages
7,284
Location
MN
Usually they glue that floor onto a 1/4 inch piece of plywood. So you might be able to pull up the whole thing. Pull the vent and take a looksky
 
OP
C

camaross

Well-known member
Joined
Oct 15, 2009
Messages
1,735
Location
Maryland
Thank you so much! You are absolutely right. Please see the picture for the 1/4 inch plywood. My next question is should I put the ceramic titles directly on the plywood, after removing the 1/4 inch one? Will that destroy my plywood? If I install the cement board from Home Depot first, could the titles be too high compared to the wood floor in other areas of the house?

P8280351.jpg



Usually they glue that floor onto a 1/4 inch piece of plywood. So you might be able to pull up the whole thing. Pull the vent and take a looksky
 

Chitown_hillbilly

Well-known member
Joined
Sep 6, 2011
Messages
982
Location
Morris, IL
Thank you so much! You are absolutely right. Please see the picture for the 1/4 inch plywood. My next question is should I put the ceramic titles directly on the plywood, If I install the cement board from Home Depot first, could the titles be too high compared to the wood floor in other areas of the house?

Can you install over the plywood? Yes... Should you? No. You should pull up the subfloor and put down Cement board to get your floor levels close.
 

awdblazer

Well-known member
Joined
Oct 17, 2011
Messages
1,100
Location
winnipeg, manitoba, canada
leave the subfloor, screw the hell out of it, put down cement board and go on tiling
the thicker the subfloor and the more solid the subfloor the less chance of your tiles to crack or grout lines to crack
 
To avoid these ads, REGISTER NOW!

Craftsman86

Well-known member
Joined
Jan 19, 2012
Messages
323
Location
Savage MN
Clean the subfloor as much as possible with a scraper and then lay out your cement board. Once laid out use a 1/4 x 1/4 trowel and put a layer of thinset between the plywood and the cement board and then screw it down. this will save you a ton of headaches in the future. Now you are ready to tile. Be sure when you screw in the cement board you use cement board screws and counter sink the heads to keep your tile from cracking.
 

Average_Joe

Well-known member
Joined
Mar 13, 2011
Messages
209
Location
Summerville, SC
You more than likely have 2 layers of subfloor there to bring the vinyl up to the height of the hardwood. If so, I would pull the top layer (likely to be 1/2" or 5/8"). Drill 3/4" or so hole so you can see what's there. You need a 3/4" subfloor under the tile backer. 1/4" backer plus the tile usually gets you flush with the hardwood.
 

slickgt1

Well-known member
Joined
Oct 11, 2010
Messages
1,674
You more than likely have 2 layers of subfloor there to bring the vinyl up to the height of the hardwood. If so, I would pull the top layer (likely to be 1/2" or 5/8"). Drill 3/4" or so hole so you can see what's there. You need a 3/4" subfloor under the tile backer. 1/4" backer plus the tile usually gets you flush with the hardwood.

Do this, get is as flush with the hardwood as you can. Trust me you will like the cleaner feel of it. If it gets too high, you will need a transition threshold. Sometimes you don't have an option.
 
To avoid these ads, REGISTER NOW!
Top Bottom