I have a 500 gallon underground tank. I want put a tee, shut off valve, and POL/bbq fitting so I can run a dual fuel 9000 watt generator from it. Any plumbing gurus that can help me piece together the best way to do this with my set up? Am I better off teeing into the copper line? In the Iron line?
I've tried and tried to get a professional plumber but nobody is interested in doing the job. So DIY time.
I believe I need to tee in before the regulator since the generator comes with it's own?
I've tried and tried to get a professional plumber but nobody is interested in doing the job. So DIY time.
I believe I need to tee in before the regulator since the generator comes with it's own?
Attachments
Last edited:
