hockey88fan
Well-known member
- Joined
- May 25, 2011
- Messages
- 428
So I've been working on running my utilities thru the cinder block wall in my basement. I have removed one whole block as I am going to be running 4 pcs of conduit into the basement so I needed a big opening. So obviously with all the pipes sticking thru the opening I'm going to have to patch the hole with little pieces of block and mortar. Should I use hydraulic cement patch for the complete job on this? Thanks
