As the title says, I promise I looked first before I decided to post this question.
Of course my question will be directed to people that live in a snowy environment, but those of you that are experts that don't have snow are more than welcome to comment too.
I am going to be building a 14 x 20 shed (trying to convince the wife that 16 x 20 is better, but her gardens.......gardens.....sigh)....., anyway the shed will be used for storage of my snowmobile, ATV, lawn tractor (winter time only) and other **** that people normally accumulate.
Not trying to blame my wife too much here, but she is a bit of a freak when it comes to things and is quite hopeful that we don't need to do a poured floor.
Partly because.....I actually don't know why, and partly because the only way to get to the back of the property would involve driving over our septic bed or making a bridge over our pond.
I was hoping to just to a skid based floor over a bed of gravel, or should I do a pier mount install?
I've even seen guys that have buried 6x6's to make leveling easier, but is that advisable in our climate here north of Toronto?
So I guess what I'm asking is....
A) tell the wife to **** it up and go with a poured floor
B) skid over gravel is fine, you will just have to deal with adding a ramp
C) pier mount would be my choice, and you still will have to deal with a ramp
Thanks in advance for your suggestions.
Of course my question will be directed to people that live in a snowy environment, but those of you that are experts that don't have snow are more than welcome to comment too.
I am going to be building a 14 x 20 shed (trying to convince the wife that 16 x 20 is better, but her gardens.......gardens.....sigh)....., anyway the shed will be used for storage of my snowmobile, ATV, lawn tractor (winter time only) and other **** that people normally accumulate.
Not trying to blame my wife too much here, but she is a bit of a freak when it comes to things and is quite hopeful that we don't need to do a poured floor.
Partly because.....I actually don't know why, and partly because the only way to get to the back of the property would involve driving over our septic bed or making a bridge over our pond.
I was hoping to just to a skid based floor over a bed of gravel, or should I do a pier mount install?
I've even seen guys that have buried 6x6's to make leveling easier, but is that advisable in our climate here north of Toronto?
So I guess what I'm asking is....
A) tell the wife to **** it up and go with a poured floor
B) skid over gravel is fine, you will just have to deal with adding a ramp
C) pier mount would be my choice, and you still will have to deal with a ramp
Thanks in advance for your suggestions.