my58
Well-known member
I have a piece of equipment that utilizes a number of circuit breakers and has power supplies and other components that are needed for setup. In the past I would deliver the equipment and once it was placed then a local electrician would come and wire in a subpanel and then we would come back another time and mount the power supplies and connect everything else up, or we would talk others through the proper steps and each installation becomes a 1 off custom setup. It causes big delays because we need to coordinate lots more separate pieces that often get lost, it is a lot more time consuming wiring up the different pieces onsite with limited tools and often in the way of other people trying to work and do their job, and placement of components are never in the same spot so there is no consistency so months later if a problem arises it is a pain to talk or troubleshoot over the phone.
What I was wondering is could I purchase/build a "Power equipment box" Basically have a large cabinet that I have a local to me electrician mount a breaker box on, wire the outlets properly in or on the box, I then mount the power supplies and all the other peripherals properly and have everything connected. I could then have everything ready and connected consistently so when installing we could place the equipment, bolt this power box to the ground and all the local electrician onsite would need to do is to bring power from the main electrical room to this sub panel and energize it.
This setup would save so much time and frustration for everyone. Would something like this "power box" be legal and within code?
Where do I look to find the codes relating to this for California?
Is there such a thing as an electrical consultant I hire to figure this out with me or just hire a regular electrician.
All help and thoughts are appreciated.
Thanks
What I was wondering is could I purchase/build a "Power equipment box" Basically have a large cabinet that I have a local to me electrician mount a breaker box on, wire the outlets properly in or on the box, I then mount the power supplies and all the other peripherals properly and have everything connected. I could then have everything ready and connected consistently so when installing we could place the equipment, bolt this power box to the ground and all the local electrician onsite would need to do is to bring power from the main electrical room to this sub panel and energize it.
This setup would save so much time and frustration for everyone. Would something like this "power box" be legal and within code?
Where do I look to find the codes relating to this for California?
Is there such a thing as an electrical consultant I hire to figure this out with me or just hire a regular electrician.
All help and thoughts are appreciated.
Thanks