Hoping some GJ brainstorming can solve some issues for me...
Have a 24x48" capacity CNC router... Problem is - 1/2hp router running for hours on end - makes wife and neighbours cranky... thinking i need to build an insulated enclosure around it but drawing blanks as to how to make it happen...
Enclosing it has 2 challenges - wire routing for the controls and router power, airflow - still need to move air through to keep the steppers and router itself from cooking... and since it will be enclosed - i need to finalize a shopvac scenario to pull away routed materials so they dont gum up the works...
Shop vac for hours on end turns into the same debate we started with - how the heck do I muffle a shop vac to not drive everyone nuts?
Anyone have some thoughts as to how to move forward?
Thanks in advance!
Have a 24x48" capacity CNC router... Problem is - 1/2hp router running for hours on end - makes wife and neighbours cranky... thinking i need to build an insulated enclosure around it but drawing blanks as to how to make it happen...
Enclosing it has 2 challenges - wire routing for the controls and router power, airflow - still need to move air through to keep the steppers and router itself from cooking... and since it will be enclosed - i need to finalize a shopvac scenario to pull away routed materials so they dont gum up the works...
Shop vac for hours on end turns into the same debate we started with - how the heck do I muffle a shop vac to not drive everyone nuts?
Anyone have some thoughts as to how to move forward?
Thanks in advance!
