I am about to lay out the pex, and I was wondering what you all do about the crack control cuts. It will make a very complicated layout if I try to keep the tubing from running under all the lines that will be cut.
The pex is being tied to wire mesh, so it will get pulled up to (hopefully) just about half way when the floor is poured, but I do worry that it might end up too high somewhere.
The pex is being tied to wire mesh, so it will get pulled up to (hopefully) just about half way when the floor is poured, but I do worry that it might end up too high somewhere.