Guys,
Please be aware, some of these metal building deals without concrete seem like a good deal. The cost of a 6" poor of 3500 psi concrete can be as much as the building.
I liked all the little things Morton did for me.
*Built MY design, not pushing their own easy build
*Dumpster on site
*Porta-potty on site
*All materials delivered two days before job started on site
*Gave me any left over trim, panels, scrap wood I wanted
(made two work benches out of 2 X 4 scrap lumber)
*Crew on time and polite (No scumbag contractors here)
*Vapor barrier under concrete slab
One other thing I would like to mention, my Morton guys did EVERY aspect of the job. even the final grading was included (my grass seed). when you add all this little stuff together Morton can still be competitive in pricing.
If you need a discount building due to money issues that's understandable , but this was my dream garage I have waited for all my life.
My wife's motto "Get what you really want the first time"