Next was the electrical. At first, I just wanted to get the power to the shop panel, get it approved, then move onto pouring the floor. When I went to go get it inspected, the inspector told me that I had to have exterior lights over all man doors, and an interior switch at every man door that would illuminate a path to the panel. That translated into, well, a change in plans.

. So I ended up putting in more electrical than I wanted to at this point, but oh well.
I realized that I don't have a lot of pictures, so I will try to get some more in the coming days. We have 200 amp service to the shop. All outlets will be 20 amp outlets, and they are every 4 feet along the wall. I put them at 48" high, so I can put workbenches wherever I want, and I won't cover them up.
We went with 8-foot, 4 bulb, T5 high output strip lights. I debated the T8 vs. T5 for a long time, but finally decided on the T5 because they should last longer. The ceilings are 17 feet, so changing bulbs is going to be a chore. I also went with 5000k light so that it was more of a white daylight look. I have to tell you, they are beautiful. I absolutely love the light.
The electrical installation was pretty fun (the kids loved it). We rented an AWD scissor lift to do the ceiling work. That thing worked amazingly well. They aren't cheap, so we were in a rush to get a lot of stuff done quickly. I had my father-in-law helping, so we were able to get a lot of work done quick.